159.225 Assignment

Contain all assignment work

Assignment 1

image.png ![image.png](1

Description

Write a project plan about

  • analysis
  • modelling
  • high-level design

IMPORTANT: NO development, rollout or testing phases of the project.

Time Line:

3 days

image.png

Day1

PRE-WORK

  • Organized all concepts Assign1 need
  • Search and understand back-info
Format Requirement
  • A description and explanation of any assumptions you have made in your project planning
  • A WBS, Gantt or PERT chart for the analysis, modelling and high level design part of the project.
  • DO NOT need to produce the actual diagrams, you are only deciding which ones will be produced at a later stage
  • make any necessary assumptions if relevant information is not given in the project brief ensure that you describe these assumptions in your report (first item above).
  • 4000 to 5000 words long
  • The suite of certain diagrams and documents ==will== produce
  • describe the different ==levels of detail== in the diagrams (conceptual level, logical level)
Content Requirement
  • A ===system request=== document
  • A ===technical feasibility=== analysis
  • Recommendation of systems development ===methodology=== and Reason
  • Description of the team member with ==role== they played and reason
  • A ==Requirements gathering== plan, how and what do you need specifically?
  • A ==stakeholder engagement== plan

image.png

System Request
  • Business Need
  • Business Requirements
  • Business Value
  • Special Issue of Constrains
technical feasibility
  • familiar with business area
  • familiar with technology
  • project size
  • compatibility
Organization Feasibility
methodology
requirements gathering
  • Requirements-Gathering Techniques
  • requirements analysis strategies
  • requirement definition

Last modified March 28, 2025: simplify note (4681a09)